MRJ विकास कार्यक्रम मित्सुबिशी विमान कॉर्प द्वारा. पुनर्गठन कर दिया गया है, स्थिति मध्य 2020 में पहली MRJ90 की डिलीवरी शुरू करने के लिए. नीचे, आप मित्सुबिशी क्षेत्रीय जेट की प्रगति को कवर उनकी हाल ही में रिलीज के एक हिस्से को मिलेगा.
टाइप प्रमाणीकरण की ओर प्रगति सुनिश्चित करने के लिए, मित्सुबिशी विमान कॉर्प. has restructured the MRJ development program and built one of the best teams in the industry, hiring many global engineers with experience in innovative commercial aviation programs to work alongside the Japanese experts in design and manufacturing. We are already seeing significant progress under this new approach, positioning the MRJ to successfully enter the market with type certification in 2019 and first delivery of the MRJ90 in mid-2020. Here is a list of a few recent flight and ground test accomplishments that are vital towards achieving certification.
Pushing The Flight Envelope
अप्रैल 2017 Flight Load Survey
Results from the flight load survey test were expected and aerodynamic loads for each component fell firmly within the design limit loads. Completion of this test clears the aircraft to fly through its entire envelope, allowing pilots to fully exercise all control inputs. This vital test dictates the maturity of the aerodynamic design and confirms an aircraft can safely operate throughout its flight envelope.
Operating At -40 Degrees
फ़रवरी. 28 — Mar. 17 2017 Cold & Hot Soak
The results from this test have allowed our engineering teams to validate the thermal models and improve the design. Once environmental control system design improvements are implemented, the next steps are FTA-4 deployments to natural hot and cold locations to continue the testing and validation. Key tests at the Eglin’s Mckinley Climatic Laboratory evaluated the operational capability of airframe and system components, such as engines, in a broad range or temperatures ranging from extreme cold (-40 सी) to extremely hot (50 सी).
ज़्यादा पढ़ने के लिए यहां क्लिक करें
इस लेख मूलतः पर तैनात किया गया है FlyTheMRJ.com